projman #5367 dates and costs tables [resolved]
In the costs and dates tables, the rendering of inner tasks should be: My task of level 0 \xA0 \u203A My task of level 1 \xA0 \xA0 \xA0 \u203A My task of level 2 \xA0 \xA0 \xA0 \xA0 \xA0 \u203A My task of level 3 \xA0 \xA0 \xA0 \xA0 Synthesis My task of level 2 \xA0 \xA0 Synthesis My task of level 1 Synthesis My task of level 0 The initial prefix is therefore :
| |
priority | normal |
---|---|
type | bug |
done in | 0.13.4 |
load left | 0.000 |
closed by | <not specified> |
Comments
-
2008/06/26 14:28, written by ocayrol
add commentThe synthesis line inserted at the end of a complex task should be aligned with the first line of this complex task (that gives the name of this complex task).