projman #2964 resource view [resolved]

Today, in the cost view, you have a DocBook table that display one task per line, the cost (in the last column) and the resource consuption (in the third column). The resource consuption is a list that looks like : resource-id(resource-load), id(load), etc.

When you have a little number of resources (less than 5), it would be more readable to have a column per resource and write in this column the load for the resource in the task.

An option could be added to control the behaviour "list of resources in a single column" / "one column per resource".